ヘルプとサポート

Choose your location and language settings

Japan

|

Japanese

Global

Germany

Switzerland

United Kingdom

Ireland

France

Netherlands

Belgium

Spain

Portugal

Italy

Russia

Poland

Czech Republic

Denmark

Sweden

Norway

Finland

USA

Canada

Mexico

Colombia

Chile

China

Korean

Singapore

Hong Kong

Vietnam

Japan

Australia / New Zealand

UAE

South Africa

India

Gwinnett Stripers, Coolray Field

ロケーション: Atlanta - United States of America

プロジェクトタイプ: 商業 - 政府および公共部門

  • 160+
  • 70
  • 10,427

Coolray Field | Stripers: Extending the ability to smart access with wire-free networked locks

Life before SALTO was hectic because you had to find the right keys, go through the key box, and no one ever put them back where they should be! But with SALTO electronic access, we don’t have to deal with that anymore. SALTO was able to offer access control for everything: doors on our stairwells, padlocks on our gates, elevator controls, mortise locks on doors, and panic bars on all exterior doors. We highly recommend SALTO. It’s been a very easy transition to get all the new locks in.

Avery KeslerStadium Operations Manager, Gwinnett Stripers

主なメリット

The SALTO Space smart access platform was an ideal match for the Gwinnett Stripers project, providing a range of access control solutions, including wired, wireless, and wire-free options. The platform introduced groundbreaking features such as the ability to issue physical or mobile credentials with convenient over-the-air (OTA) access permission modifications. The initial installation process was streamlined, requiring only SALTO ProAccess managment software, XS4 electronic locks, and credentials. Thanks to SALTO's data-on-card technology, the need for extensive network infrastructure, expensive power supply units, and costly wiring was significantly minimized.

Ron ShafferRon ShafferTechnology Business Development Leader
Gwinnett Stripers, Coolray Field
Gwinnett Stripers, Coolray Field
Gwinnett Stripers, Coolray Field
Gwinnett Stripers, Coolray Field
Gwinnett Stripers, Coolray Field

The Salto technology solution provided at the project.